Challenges
Datasets
Workspaces
Papers
Discussions
Leaderboard
Log inSign up
Challenges
Datasets
Workspaces
Papers
Discussions
Leaderboard
Blog
Job Board
Q3AS

© 2026 Aqora Quantum S.A.S.

TermsPrivacyLegal Notice

Towards a High Duty Cycle Transportable 171Yb Clock

Fatima Rahmouni, Jesús Romero González, Benjamin Pointard, Jérôme Lodewyck, Rodolphe Le Targat

Published Jun 24, 2024• 0 citations
OpenAlex

Related papers

Towards a High Duty Cycle Transportable 171Yb Lattice Clock

Fatima Rahmouni, Jesús Romero González, Benjamin Pointard +2 more

•Jun 16, 2024•0 citations

Towards a compact transportable optical clock based on the octupole transition in 171Yb+

Xuanjian Wang, Jian Zhong Cao, Hualin Shu +5 more

arXiv:2510.10476•Applied Physics B•Nov 12, 2025•1 citation

Towards a transportable 171Yb optical lattice clock for geodetic exploration

Anne-Katrin Landa, Martin Pearlstein, Fatima Rahmouni +11 more

•Oct 20, 2025•0 citations

Duty cycle engineering for improved optical lattice clock stability

Filip Butuc-Mayer, Matthew Johnson, Chen-Hao Feng +3 more

Abstract We describe a method of duty cycle engineering in optical lattice clocks to reduce clock instability through tailoring of the Dick effect noise contribution. We apply dynamically decoupled interrogation sequences to realise an estimated improvement in single clock instability approaching a factor of two, as well as providing a route to zero dead-time operation for two interleaved clocks which are otherwise unable to reach the required duty cycle. We show through simulations and synchronous measurements of clocks NPL-Sr1 and NPL-Sr2 that a quantum projection noise limited instability < 3 − 10−17 τ −1/2 can be realised in a near ideal zero dead-time configuration.

Journal of Physics Conference Series•Nov 1, 2024•0 citations

Towards a high flux transportable Ytterbium Optical lattice Clock

Fatima Rahmouni, Jesús Romero González, Benjamin Pointard +10 more

•Sep 26, 2022•0 citations

Beyond Idealized Fragmentation: Duty-Cycle-Limited Completion Time of Post-Quantum Handshakes over LoRaWAN

Dipul Poudel

Post-quantum cryptography (PQC) migration for the Internet of Things is under way, but prior LoRaWAN evaluations estimate PQC handshake time from payload size alone, ignoring LoRaWAN’s mandatory duty cycle. We show that under EU868’s 1% duty cycle, the wall-clock time to send the combined ML-KEM handshake volume uplink exceeds the idealized estimate of prior work by three to five orders of magnitude: minutes at SF7, hours at SF12. A closed-form airtime model reproduces our ns-3 results to within rounding and separates rate-mismatch, airtime-overhead, and duty-cycle factors; duty cycle dominates at SF7 but not at SF12. Handshake duration, not only packet loss, is thus a key obstacle to practical LPWAN PQC deployment.

IEEE Networking Letters•Jan 1, 2026•0 citations
Abstract We describe a method of duty cycle engineering in optical lattice clocks to reduce clock instability through tailoring of the Dick effect noise contribution. We apply dynamically decoupled interrogation sequences to realise an estimated improvement in single clock instability approaching a factor of two, as well as providing a route to zero dead-time operation for two interleaved clocks which are otherwise unable to reach the required duty cycle. We show through simulations and synchronous measurements of clocks NPL-Sr1 and NPL-Sr2 that a quantum projection noise limited instability < 3 − 10−17 τ −1/2 can be realised in a near ideal zero dead-time configuration.
Post-quantum cryptography (PQC) migration for the Internet of Things is under way, but prior LoRaWAN evaluations estimate PQC handshake time from payload size alone, ignoring LoRaWAN’s mandatory duty cycle. We show that under EU868’s 1% duty cycle, the wall-clock time to send the combined ML-KEM handshake volume uplink exceeds the idealized estimate of prior work by three to five orders of magnitude: minutes at SF7, hours at SF12. A closed-form airtime model reproduces our ns-3 results to within rounding and separates rate-mismatch, airtime-overhead, and duty-cycle factors; duty cycle dominates at SF7 but not at SF12. Handshake duration, not only packet loss, is thus a key obstacle to practical LPWAN PQC deployment.