Challenges
Datasets
Workspaces
Papers
Discussions
Leaderboard
Log inSign up
Challenges
Datasets
Workspaces
Papers
Discussions
Leaderboard
Blog
Job Board
Q3AS

© 2026 Aqora Quantum S.A.S.

TermsPrivacyLegal Notice

KS-CAM Phase I Closure Record: Methodological Closure Without a Physical Result on ξ0

Arturo Cerezo

Published Jul 14, 2026• 1 citation
Publisher

Abstract

Day-D calibration was executed on ibm_kingston, trio [13,14,15] (Batch e2e4778b, jobs d9cj4tsi/d9cjh21h/d9cjhsan, PLAN:369ff001573e1c7ff9cb8601, drift bracket PASS). The frozen theta_cal gate FAILED with 14 causes (T2-echo/Ramsey sector: fits pegged at bounds, c_corr unidentifiable, holdout envelope out of jurisdiction), verdict INDETERMINATE-by-calibration. Per the published governance (v1.1, DOI 10.5281/zenodo.21385546), Block D was NOT executed and remains prohibited. Forensic note: T1, readout, T_qs(q0,q1) and static ZZ fitted sanely; the failure signature indicates a physics gap in the frozen M5 echo/Ramsey fit models (missing amplitude-damping floor at long delays), exposed only by real hardware — synthetic and mock banks could not see it. This record contains the raw calibration suite and the partial Lock for full traceability of why the trial did not open. Lock sha256: 5482d46166253fa89ab370eac860dfa7e77ccd51944c41b42d6463a511e6ad4c. Calibration suite sha256: 3069ae38347ad726603b4c8d260ef18d3964cf1e6d9c8b8a3f820ac2f322c073. Blinding commitment (unused today): ade1a565f6e28d8214582d79... No result on xi_0 exists.

DOI
10.5281/zenodo.21348048

Related papers

CNC Fork Experiment (T=2): Second Hardware Run Forensics and a Certifiable Replication Protocol (Test 3)

Dale James Raymond

This report records and interprets the second real-device execution of the CNC fork experiment in the certifiable T = 2 “binary-clock” design (runner v3), including a software-forensics correction: an obsolete analysis JSON incorrectly reported ν = 1.0 even though all 2-bit clock patterns are legal by construction in T = 2. It also specifies a final replication run (“Test 3”) intended to be maximally robust against the dominant remaining failure mode (near-threshold readout invasiveness on ibm_fez). A conclusive outcome of Test 3 is meaningful regardless of direction, because (as preregistered) the runner only emits a conclusive label after certifying overlap and bounding nuisance effects (mismatch and readout invasiveness). Run metadata (from locked runner output): backend: ibm_fez output created (UTC): 2026-01-10T19:03:16.074947+00:00 IBM Runtime job id: d5ha332gim5s73ahnueg physical layout (C1,C2,S): [1, 2, 3] protocol blocks: ε ∈ {0.40, 0.20} (primary block ε = 0.40) Qiskit versions (recorded by harness): qiskit 2.2.3, qiskit-ibm-runtime 0.43.1 Key certified outputs (primary block, ε = 0.40): D̄ = 0.381793 ν = 0.016503 (≤ ν_max = 0.020) ε_inv = 0.047647 (≤ ε_inv,max = 0.050) δ′ = 0.313209 decision (locked runner): reject hard CNC The Test 3 OSF preregistration is complete and time‑stamped, but remains embargoed until execution; the public link will be added here immediately after the embargo is lifted. Raw run artefacts and outputs to be archived as a separate Zenodo Dataset record by the hardware executor (Morgan Cameron). This report is a forensic note and replication/protocol document.

•Jan 22, 2026•0 citations

UCT Prediction 2 (Stage 2c): Platform-Specific Pre-Registration for IBM Fez Z₂³ Test Under Topological Gate

Gabriel Steiger

Fresh IBM Fez platform-lock pre-registration for executing the (Z_2)^3 prediction under the Stage 1c topological gate (DOI 10.5281/zenodo.20404635). Locks: backend ibm_fez, qubits (15, 2, 23), calibration snapshot of 2026-05-27T02:18:29Z (SHA-256 3f69b12d793b7c0cfc1f7cb343b3a0b8c40f04ae3a6239f7e3edd48192dadd1d), analysis script SHA-256 69c5e040c96f8b0f3fd50bc5014a63b4d461129d2e2affb0297f54887d871534, execution parameters (16,000 shots per circuit, 36 circuits total, bootstrap seed 20260526), and outcome reporting commitment.The Stage 1c gate authority (R_gap = (τ - σ_2) / std(σ_2^bootstrap) ≥ 3.0 with m̂_0 = 1) replaces Stage 1b §6.2's union-bound mundane gate. All other Stage 1b provisions (predictions 7/8 vs 8/9, operational f̂ definition, statistical-power requirement, Bayes-factor decision rule) remain in force.This Stage 2c is distinct from Stage 2 (DOI 10.5281/zenodo.20360347) which locked qubits (15, 25, 56) against a 2026-05-23 calibration epoch and yielded the INDETERMINATE Stage 3 outcome (DOI 10.5281/zenodo.20360386) under the old gate. The present Stage 2c lock targets a fresh calibration epoch and a freshly-quality-ranked qubit triple, and the certified execution under this lock will produce a Stage 3c result-of-execution report.Files in this deposit:uct_prediction_2_pregist_stage2c_fez.md — platform pre-registration document (SHA-256: f37062bc98e9429ffe6e92fea135ad6ff729a56c00606337747872d0a4b00dc9, 10320 bytes)ibm_fez_cal_snapshot_2026-05-26.json — locked Fez calibration snapshot (SHA-256: 3f69b12d793b7c0cfc1f7cb343b3a0b8c40f04ae3a6239f7e3edd48192dadd1d, 19485 bytes)Calibration validity window: Fez job to be submitted within 24 hours of snapshot time (by 2026-05-28T02:18:29Z). Beyond that window this Stage 2c is invalidated and a fresh Stage 2 must be deposited.Lock chain:Stage 1: 10.5281/zenodo.20360004Stage 1b: 10.5281/zenodo.20360259Stage 1c: 10.5281/zenodo.20404635 (gate authority)Stage 2: 10.5281/zenodo.20360347 (historical — different qubits and cal epoch)Stage 3: 10.5281/zenodo.20360386 (INDETERMINATE under old gate — preserved as historical record)

•May 27, 2026•0 citations

UCT Prediction 2 (Stage 3c): Certified Z₂³_SUPPORTED Result on IBM Fez Under Topological Gate

Gabriel Steiger

Certified result-of-execution report for the UCT compression-interface (Z_2)^3 prediction at d=3, executed on IBM Fez (qubits 15, 2, 23) under the topologically natural gate locked at Stage 1c (DOI 10.5281/zenodo.20404635) and the platform lock at Stage 2c (DOI 10.5281/zenodo.20404728).Outcome: Z2M_SUPPORTEDThe locked operational estimator returned f̂ = 0.87500000 exactly, matching the (Z_2)^3 prediction f = 7/8 to all decimal places, with bootstrap σ(f̂) = 0.0 across all 200 multinomial resamples. The Stage 1c topological gate passed with R_gap = 6.46 (threshold ≥ 3.0), 2.15× the locked threshold. The statistical-power gate (σ(f̂) ≤ 0.007) passed at σ(f̂) = 0.0.Singular-value spectrum of the (Z_2)^3-symmetrized POVM matrix: σ_1 = 1.0000, σ_2 = 0.0116, σ_3 = 0.0077, σ_4 = 0.0017, σ_5-σ_8 below 10^-4. With SVD threshold τ = 0.05 × σ_1 = 0.0500, the estimated singlet dimension m̂_0 = 1, supporting (Z_2)^3 architecture.Compared to the historical Stage 3 outcome (DOI 10.5281/zenodo.20360386, INDETERMINATE under Stage 1b's union-bound mundane gate on qubits 15/25/56 and an older calibration epoch), Stage 3c uses the topologically natural gate, fresh qubit triple (15/2/23) selected by composite quality at the new calibration epoch, and yields the certified Z2M_SUPPORTED outcome with R_gap = 6.46 (vs ~4.25 retroactively on Stage 3 data).IBM Quantum job ID: d8b5cbtmdd1s73b93a2gFiles in this deposit:uct_prediction_2_result_fez_stage3c.md — full report (SHA-256: 93f152046741e03bf231e7a650e80b02b4a6c6aac8b0885506f990f2bc6b4518, 8247 bytes)stage3c_analysis_result.json — analysis JSON with bootstrap distribution, singular values, R_gap, gate details, decision rule output (SHA-256: 99107f374dacfeef07b0b2976ae3cd4f193f6178bec6a855aa4839461d974b2a, 1817 bytes)stage3c_raw_counts.json — raw IBM Fez shot counts for all 36 circuits (SHA-256: 67aac6d2637ac2477696181367b103aea597b1d1758a397fe3c92934f39cdf2c, 2682 bytes)Complete lock chain:Stage 1: 10.5281/zenodo.20360004Stage 1b: 10.5281/zenodo.20360259Stage 1c: 10.5281/zenodo.20404635 (gate authority)Stage 2: 10.5281/zenodo.20360347 (historical — different qubits/cal)Stage 2c: 10.5281/zenodo.20404728 (platform lock)Stage 3: 10.5281/zenodo.20360386 (historical — INDETERMINATE under old gate)Stage 3c: THIS DEPOSIT — certified Z2M_SUPPORTED

•May 27, 2026•0 citations

UCT Prediction 2 (Stage 2): Platform-Specific Pre-Registration for IBM Fez Z_2^3 Test

Gabriel Steiger

Stage 2 platform-and-execution lock for the (Z_2)^3 branch of the UCT compression-interface theorem at d = 3 / m = 3, to be tested on IBM Fez. Companion to Stage 1 (DOI 10.5281/zenodo.20360004) and Stage 1b (DOI 10.5281/zenodo.20360259). Locks: backend = ibm_fez; qubits = [15, 25, 56]; calibration epoch = 2026-05-23T21:39:41Z (calibration CSV SHA-256 ca91f71a3e81d97e51c082ea95326f222963c6186ac1b470bb3495aac1901c4a); analysis script uct_d3_fez_test.py SHA-256 69e5f1dd042f53545e10102d1a14e2d8a3c340ac40bf177a81e053ad724272a0; N_each = 16000; bootstrap seed = 20260523; SVD threshold fraction = 0.05. Architecture is (Z_2)^3 per Stage 1b Section 4.3 (Z.1–Z.5 satisfied). This deposit tests the (Z_2)^3 discriminator branch with predicted f = 7/8 = 0.8750; U(3) primary prediction remains locked at Stage 1b awaiting qudit-capable hardware. Job to be submitted within 24-hour calibration validity window. Result reporting commitment includes INDETERMINATE outcomes at equal prominence. SHA-256 of Stage 2 pre-registration file: 2ec0a56f83541ab93ee843382591c0172dab49e8c7a1b55c94306e02dfdd2a2dByte count: 7334

•May 24, 2026•1 citation

Echo Timing and Phase Response on IBM Fez: Two Acquisitions with Reproducible Analysis

Jonathan chadbourne

Two acquisitions on physical qubit 0 of IBM Fez examine Ramsey, centered Hahn-echo and pre-idle phaseresponse, followed by asymmetric echo placement. WAVE002 (November 6, 2026) contains 416 circuits and53,248 shots. WAVE003 (November 14, 2026) contains 240 circuits and 61,440 shots. Centered echo exceededRamsey at the WAVE002 8-microsecond anchor and exceeded both quarter- and three-quarter-position echoesat both tested WAVE003 holds. The main contrasts survive a publication-level simultaneous uncertaintyallocation across both studies, conditional on independent bounded shots The supplement supplies recorded shots and counts, frozen analyzers, circuit inventories and readable instructions, archived results, offline replay and labeled exploratory model comparisons. The original WAVE002 sparse-count failure and its lossless correction are preserved. The acquisitions are complementary, not identical independent replications. Physical shot independence, pulse timing and chronological execution were not independently attested. An uncertainty-aware absolute-response comparison finds conventional quasi-static and slow finite-correlation models compatible with all pooled gain coordinates. An unsuccessful retrospective point forecast is preserved alongside its broad training-only uncertainty. No unexplained anomaly, technological improvement, unique noise mechanism, calibrated memory fidelity or new echo method is established. AI assistance is disclosed. This is a preprint, not a claim of peer review or journal acceptance.

•Nov 14, 2026•0 citations

SMPDL ECcmd_R1 S05-S07b: Deep-Well and Delta-Chain No-Gos, Rough-Modulation T2 Breakthrough (First In-Band Candidate, Tunneled Window epsilon=0.92), and Process Regulations

Coffee (SMPDL Project)

Resource-type correction (2026-11-12). The resource type of this record was mis-set at upload (dataset/report/other/preprint); it has been corrected to Working paper per the project's uniform convention that all published records are working papers. No files, version, publication date, or other scientific content were changed by this correction; only the resource-type field and this note were added. 资源类型更正说明(2026-11-12):本记录上传时资源类型误标(原为 dataset/report/other/preprint 之一),现按项目统一口径(全部已发布记录均为 working paper)更正为 Working paper。本次更正不改变任何文件、版本号、发布日期与科学内容,仅修正资源类型字段并追加本说明。 ⚠️ STATUS NOTE (added 2026-11-05): This record archives working DRAFTS / experimental process records of the SMPDL project. The project line is not closed; contents here are interim, not peer-reviewed, and not submitted for formal publication — archival use only. No claim of absolute mathematical correctness or completeness is made; validity derives from structural completeness and intra-structural relative relations. SMPDL ECcmd_R1 rounds S05-S07b. Four-round milestone. (1) S05 deep-well FAIL triple verdict: G-w scale gate (width law admits only n=2,3 wells), background-continuum premise inapplicable (pure discrete spectrum under confining potential - coordinator card error corrected by Kimi), exact S1 criterion sum rho_n/n finite (summable subfamily passes). (2) S06 delta-chain G1 kill-gate FAIL: repulsive log n chain gives (4/pi) s log s counting, 8x the target coefficient; lambda unfixable; X7 registered with repair clause (compressed lattice alpha=1/8 discovered as the exact fix: t_n=(1/8)log n preserves arithmetic comb and self-induces the a=4 envelope). (3) S07-B first directed-construction trial (anchored by 7 no-gos, 5 traits T1-T5, isomorphism-spectrum failure modes): omega-1 fractal and omega-2 pseudo-random both T2 FAIL on the six-point grid, but end-trend acceleration detected in review (gamma-branch technical-incompleteness verdict). (4) S07b terminal scan: epsilon=0.92 LANDS IN THE TARGET BAND [0.60,0.65] with mean spacing ratio 0.641446 - THE FIRST IN-BAND CANDIDATE IN THIS LINE, achieved by fixed-law pseudo-random modulation (natural crossing, not tuned). Verdict: tunneled transient, T2 parameter window established (subset of (0.90,0.95)); X8 rejected. Ten-point epsilon-response curve monotonically accelerating from 0.977 to 0.446 with no回头. Includes: mainline screening with matched-filter upgrade (200 exact roots, quantitative no-arithmetic-signature), chaos-mechanism table M-I to M-VII with T2 refined into T2a/b/c (Luo-Sarnak arithmetic-degeneracy negative example), emergence-operator trait synthesis, isomorphism spectrum restoration, branch contingency plans (pre-registered before each result), and the card-material co-delivery process regulation v1.1 after three inheritance-miss incidents. Master archives: concept DOIs 10.5281/zenodo.23318734 and 10.5281/zenodo.23685131.

•Nov 5, 2026•0 citations
Day-D calibration was executed on ibm_kingston, trio [13,14,15] (Batch e2e4778b, jobs d9cj4tsi/d9cjh21h/d9cjhsan, PLAN:369ff001573e1c7ff9cb8601, drift bracket PASS). The frozen theta_cal gate FAILED with 14 causes (T2-echo/Ramsey sector: fits pegged at bounds, c_corr unidentifiable, holdout envelope out of jurisdiction), verdict INDETERMINATE-by-calibration. Per the published governance (v1.1, DOI 10.5281/zenodo.21385546), Block D was NOT executed and remains prohibited. Forensic note: T1, readout, T_qs(q0,q1) and static ZZ fitted sanely; the failure signature indicates a physics gap in the frozen M5 echo/Ramsey fit models (missing amplitude-damping floor at long delays), exposed only by real hardware — synthetic and mock banks could not see it. This record contains the raw calibration suite and the partial Lock for full traceability of why the trial did not open. Lock sha256: 5482d46166253fa89ab370eac860dfa7e77ccd51944c41b42d6463a511e6ad4c. Calibration suite sha256: 3069ae38347ad726603b4c8d260ef18d3964cf1e6d9c8b8a3f820ac2f322c073. Blinding commitment (unused today): ade1a565f6e28d8214582d79... No result on xi_0 exists.
This report records and interprets the second real-device execution of the CNC fork experiment in the certifiable T = 2 “binary-clock” design (runner v3), including a software-forensics correction: an obsolete analysis JSON incorrectly reported ν = 1.0 even though all 2-bit clock patterns are legal by construction in T = 2. It also specifies a final replication run (“Test 3”) intended to be maximally robust against the dominant remaining failure mode (near-threshold readout invasiveness on ibm_fez). A conclusive outcome of Test 3 is meaningful regardless of direction, because (as preregistered) the runner only emits a conclusive label after certifying overlap and bounding nuisance effects (mismatch and readout invasiveness). Run metadata (from locked runner output): backend: ibm_fez output created (UTC): 2026-01-10T19:03:16.074947+00:00 IBM Runtime job id: d5ha332gim5s73ahnueg physical layout (C1,C2,S): [1, 2, 3] protocol blocks: ε ∈ {0.40, 0.20} (primary block ε = 0.40) Qiskit versions (recorded by harness): qiskit 2.2.3, qiskit-ibm-runtime 0.43.1 Key certified outputs (primary block, ε = 0.40): D̄ = 0.381793 ν = 0.016503 (≤ ν_max = 0.020) ε_inv = 0.047647 (≤ ε_inv,max = 0.050) δ′ = 0.313209 decision (locked runner): reject hard CNC The Test 3 OSF preregistration is complete and time‑stamped, but remains embargoed until execution; the public link will be added here immediately after the embargo is lifted. Raw run artefacts and outputs to be archived as a separate Zenodo Dataset record by the hardware executor (Morgan Cameron). This report is a forensic note and replication/protocol document.
Fresh IBM Fez platform-lock pre-registration for executing the (Z_2)^3 prediction under the Stage 1c topological gate (DOI 10.5281/zenodo.20404635). Locks: backend ibm_fez, qubits (15, 2, 23), calibration snapshot of 2026-05-27T02:18:29Z (SHA-256 3f69b12d793b7c0cfc1f7cb343b3a0b8c40f04ae3a6239f7e3edd48192dadd1d), analysis script SHA-256 69c5e040c96f8b0f3fd50bc5014a63b4d461129d2e2affb0297f54887d871534, execution parameters (16,000 shots per circuit, 36 circuits total, bootstrap seed 20260526), and outcome reporting commitment.The Stage 1c gate authority (R_gap = (τ - σ_2) / std(σ_2^bootstrap) ≥ 3.0 with m̂_0 = 1) replaces Stage 1b §6.2's union-bound mundane gate. All other Stage 1b provisions (predictions 7/8 vs 8/9, operational f̂ definition, statistical-power requirement, Bayes-factor decision rule) remain in force.This Stage 2c is distinct from Stage 2 (DOI 10.5281/zenodo.20360347) which locked qubits (15, 25, 56) against a 2026-05-23 calibration epoch and yielded the INDETERMINATE Stage 3 outcome (DOI 10.5281/zenodo.20360386) under the old gate. The present Stage 2c lock targets a fresh calibration epoch and a freshly-quality-ranked qubit triple, and the certified execution under this lock will produce a Stage 3c result-of-execution report.Files in this deposit:uct_prediction_2_pregist_stage2c_fez.md — platform pre-registration document (SHA-256: f37062bc98e9429ffe6e92fea135ad6ff729a56c00606337747872d0a4b00dc9, 10320 bytes)ibm_fez_cal_snapshot_2026-05-26.json — locked Fez calibration snapshot (SHA-256: 3f69b12d793b7c0cfc1f7cb343b3a0b8c40f04ae3a6239f7e3edd48192dadd1d, 19485 bytes)Calibration validity window: Fez job to be submitted within 24 hours of snapshot time (by 2026-05-28T02:18:29Z). Beyond that window this Stage 2c is invalidated and a fresh Stage 2 must be deposited.Lock chain:Stage 1: 10.5281/zenodo.20360004Stage 1b: 10.5281/zenodo.20360259Stage 1c: 10.5281/zenodo.20404635 (gate authority)Stage 2: 10.5281/zenodo.20360347 (historical — different qubits and cal epoch)Stage 3: 10.5281/zenodo.20360386 (INDETERMINATE under old gate — preserved as historical record)
Certified result-of-execution report for the UCT compression-interface (Z_2)^3 prediction at d=3, executed on IBM Fez (qubits 15, 2, 23) under the topologically natural gate locked at Stage 1c (DOI 10.5281/zenodo.20404635) and the platform lock at Stage 2c (DOI 10.5281/zenodo.20404728).Outcome: Z2M_SUPPORTEDThe locked operational estimator returned f̂ = 0.87500000 exactly, matching the (Z_2)^3 prediction f = 7/8 to all decimal places, with bootstrap σ(f̂) = 0.0 across all 200 multinomial resamples. The Stage 1c topological gate passed with R_gap = 6.46 (threshold ≥ 3.0), 2.15× the locked threshold. The statistical-power gate (σ(f̂) ≤ 0.007) passed at σ(f̂) = 0.0.Singular-value spectrum of the (Z_2)^3-symmetrized POVM matrix: σ_1 = 1.0000, σ_2 = 0.0116, σ_3 = 0.0077, σ_4 = 0.0017, σ_5-σ_8 below 10^-4. With SVD threshold τ = 0.05 × σ_1 = 0.0500, the estimated singlet dimension m̂_0 = 1, supporting (Z_2)^3 architecture.Compared to the historical Stage 3 outcome (DOI 10.5281/zenodo.20360386, INDETERMINATE under Stage 1b's union-bound mundane gate on qubits 15/25/56 and an older calibration epoch), Stage 3c uses the topologically natural gate, fresh qubit triple (15/2/23) selected by composite quality at the new calibration epoch, and yields the certified Z2M_SUPPORTED outcome with R_gap = 6.46 (vs ~4.25 retroactively on Stage 3 data).IBM Quantum job ID: d8b5cbtmdd1s73b93a2gFiles in this deposit:uct_prediction_2_result_fez_stage3c.md — full report (SHA-256: 93f152046741e03bf231e7a650e80b02b4a6c6aac8b0885506f990f2bc6b4518, 8247 bytes)stage3c_analysis_result.json — analysis JSON with bootstrap distribution, singular values, R_gap, gate details, decision rule output (SHA-256: 99107f374dacfeef07b0b2976ae3cd4f193f6178bec6a855aa4839461d974b2a, 1817 bytes)stage3c_raw_counts.json — raw IBM Fez shot counts for all 36 circuits (SHA-256: 67aac6d2637ac2477696181367b103aea597b1d1758a397fe3c92934f39cdf2c, 2682 bytes)Complete lock chain:Stage 1: 10.5281/zenodo.20360004Stage 1b: 10.5281/zenodo.20360259Stage 1c: 10.5281/zenodo.20404635 (gate authority)Stage 2: 10.5281/zenodo.20360347 (historical — different qubits/cal)Stage 2c: 10.5281/zenodo.20404728 (platform lock)Stage 3: 10.5281/zenodo.20360386 (historical — INDETERMINATE under old gate)Stage 3c: THIS DEPOSIT — certified Z2M_SUPPORTED
Stage 2 platform-and-execution lock for the (Z_2)^3 branch of the UCT compression-interface theorem at d = 3 / m = 3, to be tested on IBM Fez. Companion to Stage 1 (DOI 10.5281/zenodo.20360004) and Stage 1b (DOI 10.5281/zenodo.20360259). Locks: backend = ibm_fez; qubits = [15, 25, 56]; calibration epoch = 2026-05-23T21:39:41Z (calibration CSV SHA-256 ca91f71a3e81d97e51c082ea95326f222963c6186ac1b470bb3495aac1901c4a); analysis script uct_d3_fez_test.py SHA-256 69e5f1dd042f53545e10102d1a14e2d8a3c340ac40bf177a81e053ad724272a0; N_each = 16000; bootstrap seed = 20260523; SVD threshold fraction = 0.05. Architecture is (Z_2)^3 per Stage 1b Section 4.3 (Z.1–Z.5 satisfied). This deposit tests the (Z_2)^3 discriminator branch with predicted f = 7/8 = 0.8750; U(3) primary prediction remains locked at Stage 1b awaiting qudit-capable hardware. Job to be submitted within 24-hour calibration validity window. Result reporting commitment includes INDETERMINATE outcomes at equal prominence. SHA-256 of Stage 2 pre-registration file: 2ec0a56f83541ab93ee843382591c0172dab49e8c7a1b55c94306e02dfdd2a2dByte count: 7334
Two acquisitions on physical qubit 0 of IBM Fez examine Ramsey, centered Hahn-echo and pre-idle phaseresponse, followed by asymmetric echo placement. WAVE002 (November 6, 2026) contains 416 circuits and53,248 shots. WAVE003 (November 14, 2026) contains 240 circuits and 61,440 shots. Centered echo exceededRamsey at the WAVE002 8-microsecond anchor and exceeded both quarter- and three-quarter-position echoesat both tested WAVE003 holds. The main contrasts survive a publication-level simultaneous uncertaintyallocation across both studies, conditional on independent bounded shots The supplement supplies recorded shots and counts, frozen analyzers, circuit inventories and readable instructions, archived results, offline replay and labeled exploratory model comparisons. The original WAVE002 sparse-count failure and its lossless correction are preserved. The acquisitions are complementary, not identical independent replications. Physical shot independence, pulse timing and chronological execution were not independently attested. An uncertainty-aware absolute-response comparison finds conventional quasi-static and slow finite-correlation models compatible with all pooled gain coordinates. An unsuccessful retrospective point forecast is preserved alongside its broad training-only uncertainty. No unexplained anomaly, technological improvement, unique noise mechanism, calibrated memory fidelity or new echo method is established. AI assistance is disclosed. This is a preprint, not a claim of peer review or journal acceptance.
Resource-type correction (2026-11-12). The resource type of this record was mis-set at upload (dataset/report/other/preprint); it has been corrected to Working paper per the project's uniform convention that all published records are working papers. No files, version, publication date, or other scientific content were changed by this correction; only the resource-type field and this note were added. 资源类型更正说明(2026-11-12):本记录上传时资源类型误标(原为 dataset/report/other/preprint 之一),现按项目统一口径(全部已发布记录均为 working paper)更正为 Working paper。本次更正不改变任何文件、版本号、发布日期与科学内容,仅修正资源类型字段并追加本说明。 ⚠️ STATUS NOTE (added 2026-11-05): This record archives working DRAFTS / experimental process records of the SMPDL project. The project line is not closed; contents here are interim, not peer-reviewed, and not submitted for formal publication — archival use only. No claim of absolute mathematical correctness or completeness is made; validity derives from structural completeness and intra-structural relative relations. SMPDL ECcmd_R1 rounds S05-S07b. Four-round milestone. (1) S05 deep-well FAIL triple verdict: G-w scale gate (width law admits only n=2,3 wells), background-continuum premise inapplicable (pure discrete spectrum under confining potential - coordinator card error corrected by Kimi), exact S1 criterion sum rho_n/n finite (summable subfamily passes). (2) S06 delta-chain G1 kill-gate FAIL: repulsive log n chain gives (4/pi) s log s counting, 8x the target coefficient; lambda unfixable; X7 registered with repair clause (compressed lattice alpha=1/8 discovered as the exact fix: t_n=(1/8)log n preserves arithmetic comb and self-induces the a=4 envelope). (3) S07-B first directed-construction trial (anchored by 7 no-gos, 5 traits T1-T5, isomorphism-spectrum failure modes): omega-1 fractal and omega-2 pseudo-random both T2 FAIL on the six-point grid, but end-trend acceleration detected in review (gamma-branch technical-incompleteness verdict). (4) S07b terminal scan: epsilon=0.92 LANDS IN THE TARGET BAND [0.60,0.65] with mean spacing ratio 0.641446 - THE FIRST IN-BAND CANDIDATE IN THIS LINE, achieved by fixed-law pseudo-random modulation (natural crossing, not tuned). Verdict: tunneled transient, T2 parameter window established (subset of (0.90,0.95)); X8 rejected. Ten-point epsilon-response curve monotonically accelerating from 0.977 to 0.446 with no回头. Includes: mainline screening with matched-filter upgrade (200 exact roots, quantitative no-arithmetic-signature), chaos-mechanism table M-I to M-VII with T2 refined into T2a/b/c (Luo-Sarnak arithmetic-degeneracy negative example), emergence-operator trait synthesis, isomorphism spectrum restoration, branch contingency plans (pre-registered before each result), and the card-material co-delivery process regulation v1.1 after three inheritance-miss incidents. Master archives: concept DOIs 10.5281/zenodo.23318734 and 10.5281/zenodo.23685131.